Total Energy (MTD)
3.84 GWh
+2.1% vs baseline
Total Emissions (MTD)
1,847 tCO?e
-14.3% vs baseline
Verified Coverage
97.4 %
15-min signed intervals
Est. Cost Savings (YTD)
$2.14 M
From optimization actions
Diesel Runtime
18.2 %
-6.8% vs last month
Energy by Source
Grid Power
1.54 GWh (40%)
Diesel Generator
0.77 GWh (20%)
Battery Storage
0.58 GWh (15%)
Solar PV
0.96 GWh (25%)
Carbon Emissions by Source
Grid: 693 tCO?e
Diesel: 1,108 tCO?e
Battery: 32 tCO?e
Solar: 14 tCO?e
Carbon Intensity: 0.481 kgCO?e/kWh (portfolio average)
Top 10 Sites - Priority Actions
| Site ID | Type | Region | Energy Mix | tCO?e/mo | Potential Saving |
|---|---|---|---|---|---|
| SITE-105 | T1 | Central | 72% Diesel / 28% Grid | 48.2 | -24% if grid priority |
| SITE-137 | T1 | West | 68% Diesel / 32% Solar | 41.7 | -31% with battery |
| SITE-085 | T1 | Central | 61% Diesel / 39% Grid | 38.4 | -18% runtime opt |
| SITE-207 | A1 | North | 55% Diesel / 45% Grid | 127.3 | -22% load shifting |
| SITE-045 | T1 | South | 52% Diesel / 48% Grid | 29.8 | -15% genset tune |
Integrity Radar - Trust Score
94
Data Integrity Score
97.4 %
Signed Intervals
12
Missing Intervals
3
Clock Anomalies
0
GPS Anomalies
Active TRACE Projects
TRACE - SITE-T54 Phase 1
Monitoring
2,000
T1 Sites
45 GWh
Annual kWh
18 kt
tCO?e/yr
TRACE - SITE 1
Baseline
847
E1/C1 Sites
12 GWh
Annual kWh
8.4 kt
tCO?e/yr
TRACE - SITE 42 Pilot
Planning
500
T1 Sites
8 GWh
Est. Annual
5.2 kt
Est. tCO?e
Finance Ready - ISO 14064-2/3 Aligned
Audit pack ready for 92% of sites. Cryptographic chain-of-custody verified. SLL/Green bond documentation available.
Network Sites
Showing 50 of 2,847 sites
| Site ID | Type | Status | Last Reading | 24h kWh | 24h tCO?e | Crypto Status |
|---|---|---|---|---|---|---|
| SITE-328 | T1 | OK | 2 min ago | 847 kWh | 0.42 |
|
| SITE-409 | T1 | OK | 3 min ago | 692 kWh | 0.38 |
|
| SITE-105 | E1 | Warning | 5 min ago | 2,341 kWh | 1.87 |
|
| SITE-085 | T1 | OK | 1 min ago | 723 kWh | 0.36 |
|
| SITE-207 | A1 | Critical | 18 min ago | 4,892 kWh | 3.41 |
|
Average Daily Load Curve by Region
Pakistan
Lebanon
Nigeria
Diesel Runtime Heatmap (Hour - Day)
00:00
06:00
12:00
18:00
24:00
Energy Waste Patterns Detected
142 sites run diesel for >2h/day while grid voltage is within spec
Potential annual savings: 2.4 GWh / 1,920 tCO?e / $380K
89 sites maintain >80% battery SoC 95% of the time (oversized batteries)
Opportunity: Reallocate battery capacity or optimize charge cycles
67 sites show night-time energy that does not correlate with traffic
Potential annual savings: 890 MWh / 450 tCO?e / $89K
Optimization Recommendations
Reduce generator minimum runtime from 60 to 30 minutes at 120 sites
Energy Saved:
180 MWh/yr
Emissions Avoided:
120 tCO?e/yr
Cost Savings:
$54,000/yr
Adjust cooling setpoint +2 C at 300 T1 sites
Energy Saved:
90 MWh/yr
Emissions Avoided:
60 tCO?e/yr
Cost Savings:
$27,000/yr
TRACE - SITE-T54 Phase 1
ISO 14064-2 | Pakistan | T1 Sites
Monitoring
2,000
T1 Sites
45 GWh
Annual Energy
21.6 kt
Baseline tCO?e
18.0 kt
Project tCO?e
Avoided Emissions
3,600 tCO?e/yr
16.7% reduction from baseline
TRACE - SITE 1
ISO 14064-2 | Lebanon | E1/C1 Sites
Baseline
847
E1/C1 Sites
12 GWh
Annual Energy
8.4 kt
Est. Baseline
-
Project tCO?e
Baseline Progress
67% Complete
Monitoring period: Jan 2025 - Dec 2025
Carbon Ledger - Aggregated Intervals
| Period | Grid kWh | Diesel kWh | Solar kWh | Battery kWh | EF (kg/kWh) | tCO?e | Merkle Root |
|---|---|---|---|---|---|---|---|
| 2025-01-20 | 51,234 | 25,678 | 31,456 | 19,234 | 0.482 | 61.4 | 0x7f3a...8b2c |
| 2025-01-19 | 48,921 | 27,342 | 29,876 | 18,456 | 0.491 | 61.1 | 0x2c8d...4a1f |
| 2025-01-18 | 52,456 | 23,890 | 32,123 | 20,567 | 0.468 | 60.3 | 0x9e1b...7d3e |
Disclosure & Reporting Shortcuts
Signed Intervals
97.4 %
Coverage last 30 days
Missing Intervals
12
Last 24 hours
Clock/GPS Anomalies
3
Pending investigation
Config Changes
7
Last 7 days
Site Integrity Details
| Site ID | Signature Coverage (24h) | Last Signature Hash | Daily Merkle Root | Tamper Flags |
|---|---|---|---|---|
| SITE-328 |
|
0x7f3a8b2c...e4d1 | 0x2c8d4a1f...9e7b | None |
| SITE-105 |
|
0x9e1b7d3e...2f8a | 0x4b6c9a2d...7e1f | Time drift |
| SITE-207 |
|
0x5d2e8f1a...3c9b | 0x8a7b6c5d...4e3f | 2 gaps |
Audit Trail Log
Baseline emission factor updated
Verifier pack exported
CT mapping updated for 3 sites
Active Alerts
Data gap detected - 2 consecutive intervals missing
High diesel share while grid available
Clock drift exceeds threshold (>30s)
Firmware update available
User & Role Management
Role
View
Edit
Export
Admin
Verify
Admin
?
?
?
?
?
NOC
?
?
-
-
-
Energy
?
?
?
-
-
Sustainability
?
-
?
-
-
Verifier
?
-
?
-
?
API & Connectors
TRACE Device API
Ingest kWh from TRACE CT-based devices
Third-Party Energy API
Ingest kWh from Thunder, Galooli, etc. + add crypto CO?e layer
Bulk Import Tool
Import sites via CSV/XLS template